Case Studies
01179 777 553
Here you can see examples of how we have delivered for our clients.
Existing, new and on going.
From large scale site wide projects, infrastructure to small scale works, our work speaks for itself.

TE Connectivity Swindon
Leaders in designs and manufactures connectivity and sensor solutions.
Their products range from electrical and electronic connectors to sensors, and they serve industries like automotive, aerospace, industrial, and communications.
We have been invited to replace and upgrade their existing Fire Alarm Systems across site.
Coming Soon

Grange University Hospital A&E Extension
The Grange University Hospital, Llanfrechfa
Emergency Department Extension
Integration of new access control systems with the existing site wide system in the existing hospital.
Coming Soon

Southmeah Hospital
Working with our partners at Briggs and Forrester, we are currently in the process pf providing:
Fire Alarm.
CCTV.
Access Control.
Intruder Alarm.
Accessibility Systems.
Coming Soon

Severn & Prince of Wales Bridges
In partnership with AMEY and on the behalf of Highways England.
A comprehensive and logistically challenging project to replace aging CCTV systems and infrastructure and new security systems.
Good thing we’re not afraid of heights!

Allpay
We where invited to Hereford to help the client replace and upgrade their aging Fire and Security Systems.
Leaning on skillsets from both the client and Imperial, with help from out suppliers we have built a successful and lasting working relationship with the people at Allpay.
One of the most comprehensive CCTV & Access Control systems we’ve undertaken to date.

Etex Avonmouth
Etex, a global lightweight construction materials manufacturer, has expanded their existing site in Avonmouth, Bristol, to almost DOUBLE their size.
Investing almost 200 million euros, it is Etex’s largest production investment ever and a commitment to UK manufacturing as the industry grows.

Avonmouth ERF & PRF
Avonmouth Energy Recovery Facility and closely followed by a second part, Polymers recovery facility (PRF).
A multi phase project with a large scale CCTV and access control system.

Coopers Court & Millwrights Place
The latest phase in the Finzels Reach development within Bristol city centre.
Consisting of 2 residential developments Coopers Court, a 10 story building & Millwrights Place consisting of 15 stories.

4 Glass Wharf
The 4th new project situated at Glass Wharf in Bristol’s highly sought after Enterprise Zone, Temple Quay.
The largest building and most extensive project we have undertaken at glass wharf.
Multi discipline project with unique technical challenges.

3 Glass Wharf
Building number 3 at Glass Wharf in Bristol Enterprise Zone in Temple Quay.
A multi discipline project with a specifically designed cause and effect made especially for this project.
Working in partnership with Kone Lifts to produce software for the interconnection between the passenger lifts and the access control system.

Thanckes Fuel Depot
Works undertaken to expand and redevelop Thanckes Fuel Depot and jetty in partnership with the OPA and MOD
Due to the highly volatile nature of the site special explosion proof equipment was specified.

Energy From Waste Gloucester
Completed in Early 2020, one of the largest CCTV systems we had supplied at the time spanning internal and external areas of the site with alarm analytics all monitored from a central control room.

Bristol City FC
Bristol City Football Club Training Ground.
Its well documented that a large number of the Imperial team are avid BCFC fans and when the opportunity came up to be part of this project for one of our local teams we jumped at the chance.

University of Bristol
Dentistry
The University of Bristol’s dental school moved to a new site in central Bristol after outgrowing its existing premises at the dental hospital, where it has been based for many years.

Halo Office Building
Halo Office Building, a 7 story office building located within the centre of Bristol.
Grade A, 116,113 Sq Ft with and BREEAM 2018 outstanding certification.
Designed to achieve BREEAM Outstanding 2018 – the first building in the UK to attain this Accreditation.”

Bournemouth University
Bournemouth University Gateway Building
Completed in Early 2020, it’s unique architecture and structural design created technical challenges that with the help of our design team and product partners were able to overcome.

Bristol Business Park
A multi phase project with Building A being completed in Q2 of 2019 with buildings B and C following in Q4 2022.
Covering Cat A and B phases of each building and networking of the fire alarm within the external multi story car park system to Building B.

Little Heath Care Home
Little Heath Care Home, Bristol. a multi discipline project with Fire, Access Control, CCTV and Extensive Nurse Call, WC Alarm and Refuge Systems.

100 Victoria Street
A revamp of the existing 100 Victoria Street building with an additional 2 floors being added to the original footprint of the building.
This project covered the initial “Cat A” works and the subsequent fitouts that followed across all floors.

RNAS Yeovilton
Replacement and expansion of Life safety systems.
A multi year project spanning multiple areas of the site from replacing end of life equipment.