Case Studies

01179 777 553

Here you can see examples of how we have delivered for our clients.
Existing, new and on going.
From large scale site wide projects, infrastructure to small scale works, our work speaks for itself.

TE Connectivity Swindon

 

Leaders in designs and manufactures connectivity and sensor solutions.
Their products range from electrical and electronic connectors to sensors, and they serve industries like automotive, aerospace, industrial, and communications.

We have been invited to replace and upgrade their existing Fire Alarm Systems across site.

Coming Soon

Grange University Hospital A&E Extension 

 

The Grange University Hospital, Llanfrechfa
Emergency Department Extension

Integration of new access control systems with the existing site wide system in the existing hospital.

Coming Soon

Southmeah Hospital 

 

Working with our partners at Briggs and Forrester, we are currently in the process pf providing:

Fire Alarm.
CCTV.
Access Control.
Intruder Alarm.
Accessibility Systems.

Coming Soon

Severn & Prince of Wales Bridges

 

In partnership with AMEY and on the behalf of Highways England.

A comprehensive and logistically challenging project to replace aging CCTV systems and infrastructure and new security systems. 

Good thing we’re not afraid of heights!

Find Out More.

Allpay

 

We where invited to Hereford to help the client replace and upgrade their aging Fire and Security Systems.

Leaning on skillsets from both the client and Imperial, with help from out suppliers  we have built a successful and lasting working relationship with the people at Allpay.

One of the most comprehensive CCTV & Access Control systems we’ve undertaken to date.

Find Out More.

Etex Avonmouth

 

Etex, a global lightweight construction materials manufacturer, has expanded their existing site in Avonmouth, Bristol, to almost DOUBLE their size.

Investing almost 200 million euros, it is Etex’s largest production investment ever and a commitment to UK manufacturing as the industry grows.

Find Out More.

Avonmouth ERF & PRF

 

Avonmouth Energy Recovery Facility and closely followed by a second part, Polymers recovery facility (PRF). 

A multi phase project with a large scale CCTV and access control system.

Find Out More.

Coopers Court & Millwrights Place

 

The latest phase in the Finzels Reach development within Bristol city centre.

Consisting of 2 residential developments Coopers Court, a 10 story building & Millwrights Place consisting of 15 stories.

 

Find Out More.

4 Glass Wharf

 

The 4th new project situated  at Glass Wharf in Bristol’s highly sought after Enterprise Zone,  Temple Quay.

The largest building and most extensive project we have undertaken at glass wharf.
Multi discipline project with unique technical challenges.


Find Out More.

3 Glass Wharf

 

Building number 3 at Glass Wharf in Bristol Enterprise Zone in Temple Quay.
A multi discipline project with a specifically designed cause and effect made especially for this project.

Working in partnership with Kone Lifts to produce software for the interconnection between the passenger lifts and the access control system.

Find Out More.

Thanckes Fuel Depot

 

Works undertaken to expand and redevelop Thanckes Fuel Depot and jetty in partnership with the OPA and MOD

Due to the highly volatile nature of the site special explosion proof equipment was specified.

Find Out More.

Energy From Waste Gloucester

 

Completed in Early 2020, one of the largest CCTV systems we had supplied at the time spanning internal and external areas of the site with alarm analytics all monitored from a central control room.

Find Out More.

Bristol City FC 

 

Bristol City Football Club Training Ground.

Its well documented that a large number of the Imperial team are avid BCFC fans and when the opportunity came up to be part of this project for one of our local teams we jumped at the chance.

Find Out More.

University of Bristol
Dentistry

 

The University of Bristol’s dental school moved to a new site in central Bristol after outgrowing its existing premises at the dental hospital, where it has been based for many years. 

Find Out More.

Halo Office Building

 

Halo Office Building, a 7 story office building located within the centre of Bristol. 
Grade A, 116,113 Sq Ft with and BREEAM 2018 outstanding certification.     
Designed to achieve BREEAM Outstanding 2018 – the first building in the UK to attain this Accreditation.”

Find Out More.

Bournemouth University

 

Bournemouth University Gateway Building

Completed in Early 2020, it’s unique architecture and structural design created technical challenges that with the help of our design team and product partners were able to overcome.

Find Out More.

Bristol Business Park

 

A multi phase project with Building A being completed in Q2 of 2019 with buildings B and C following in Q4 2022.

Covering Cat A and B phases of each building and networking of the fire alarm within the external multi story car park system to Building B.

Find Out More.

Little Heath Care Home

 

Little Heath Care Home, Bristol.  a multi discipline project with Fire, Access Control, CCTV and Extensive Nurse Call, WC Alarm and Refuge Systems.

Find Out More.

100 Victoria Street

 

A revamp of the existing 100 Victoria Street building with an additional 2 floors being added to the original footprint of the building.
This project covered the initial “Cat A” works and the subsequent fitouts that followed across all floors. 

Find Out More.

RNAS Yeovilton

 

Replacement and expansion of Life safety systems.

A multi year project spanning multiple areas of the site from replacing end of life equipment.